Custom Search

Toyota Tundra Double Cab 2007 AMP Installation Guide

Toyota Tundra Double Cab 2007 AMP Installation Guide

Remove parking brake cable support from frame. Seperate bracket and remove bracket from brake cable. Flip bracket 180 degrees to cable. Secure parking brake cable support to frame so that the bolt is now below the cable.

Slide motor assembly onto drive shaft and mounting bosses of driving linkage assembly. Use socket head cap screws (9) and tighten to 8 ft-lbs / 11Nm.

Install motor link-age on driver side in second set of factory running board holes from front. Use flange bolt (10) and torque to 22 ft-lbs / 30Nm.

Install idler linkage in last set of factory running board holes from front. Use flange bolt (10) and torque to 22 ft-lbs / 30Nm.

Get pdf Toyota Tundra Double Cab 2007 AMP Installation Guide

Related Posts with Thumbnails