C-10, C-11 & C-12 Series Racks Assembly Instructions
Connect front and rear sections
Each side rail side contains a front and rear section preassembled for easier assembly. The front and rear sections are banded together. Remove the banding and separate the front and rear rail sections from packaging. On a flat surface, place boards under the front and rear rail sections as shown so that the rear ‘Y’ bracket does not touch the ground. This will make aligning the front and rear rail sections faster. On the front section (the end with the straight round tube), slide the 5” bracket backwards until the two back holes on the 5” bracket line up with the two holes on the end of the lower rectangle tube. Insert the rear rail section into the 5” bracket and line up with two remaining holes.
Connect front and rear sections
Note the orientation of the other carriage bolts on rail assemblies.
For the top round tube, use (2) 3/8”-16 x 1-3/4” carriage bolts, (2) 3/8” split lock washers and (2) 3/8”- 16 nuts, install hardware finger tight. Repeat for other side rail.
For the lower rectangle tube, use (4) 3/8”-16 x 3” carriage bolts, (4) 3/8” split lock washers and (4) 3/8”- 16 nuts, install hardware finger tight. Repeat for other side rail.
Install front Crossbar.
The front crossbar is the smooth rectangle tube with the round bolt holes in each end. Secure the front cross bar to the ‘H’ brackets mounted on the side of the front rail sections using (4) 3/8”-16 x 2” carriage bolts, (4) 3/8” split lock washers and (4) 3/8”-16 nuts. Finger tighten only.
Get pdf C-10, C-11 & C-12 Series Racks Assembly Instructions